The site navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move across top level links and expand / close menus in sub levels. Up and Down arrows will open main level menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.

News

NECA Releases Guidelines for Dealing with Coronavirus COVID-19 on Construction Sites

Mar 18, 2020

Closing a construction project on short notice should be treated as an organized integral part of the project. Each step should be as carefully planned and executed as any other portion of the project. The construction industry must prepare for the effects of COVID-19 and mitigate the potential harm to workers and projects.  NECA has helped develop new guidelines for addressing COVID-19 during these challenging times.

Download Here

IMPORTANT: The guidelines in this message do not address contract obligations or insurance coverages. These basic guidelines are in the interest of construction worker’s safety, health and well-being.