The site navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move across top level links and expand / close menus in sub levels. Up and Down arrows will open main level menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.

News

NECA Member Aldridge Electric Highlighted for Recent work Utilizing BIM and Prefab at Chicago's O'Hare Airport

Nov 8, 2019

Aldridge Electric's recent work as the General Contractor for the 9C NAVAIDs project at Chicago O'Hare Airport is an example of how BIM technology and prefabrication are modern innovative solutions.

By creating 3D models to layout the project they were able to find obstacles during the preconstruction phase and optimize performance for prefabrication opportunities which allowed for an overall safer and more efficient project.

LEARN MORE ABOUT THE PROJECT