The site navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move across top level links and expand / close menus in sub levels. Up and Down arrows will open main level menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.

In-Seat

How to Build a Productive and Profitable Work Breakdown Structure - Ohio/Michigan Chapter | November 10, 2017

Ohio/Michigan Chapter Office, 727 Lime City Road , Rossford, OH US
Learn More about How to Build a Productive and Profitable Work Breakdown Structure - Ohio/Michigan Chapter | November 10, 2017

The most profitable and productive projects are a result of effective project planning. A solid Work Breakdown Structure is imperative to lay the proper foundation. WBS is the Project Road Map and Build Process tailored exactly to the need of construction project. It is created by the foreman or supervisor, who will run the job and be reviewed by the project manager. An accurate WBS allows the project team to transparently track work, reduce waste, prevent errors and improve accuracy to promote safer and more cost effective projects. This program will explain how to break down the job using WBS and discuss decision making factors that define the project, as well as accurate work breakdown structure.

Following this course, participants will be able to:

• Define Work Breakdown Structure
• Explain how to apply WBS to a project
• Discuss the benefits WBS brings to a project