We Are the National Electrical Contractors Association

The Voice of the Electrical Construction Industry. Learn More
Welcome back,

Full Event Description

Do It Yourself Layout and Build Out of an Effective Prefab Shop - Minneapolis Chapter | December 11, 2019

12/11/2019

  • Location: Sheraton Minneapolis West, 12201 Ridgedale Drive, Minnetonka, MN

Prefab is now the “norm” of the industry, which has opened a whole new need and interest in how to ensure the prefab shop itself is productive. The layout of material, work, and information flow in prefab is key to making this happen. This course is designed to give participants an overview of how to layout the shop to optimize production in the shop, and have the highest contribution to profitability at the jobsite. The course will explain the obstacles and bottlenecks that are created in a prefab shop.  Whether installing or implementing a prefab shop for the first time or with a view to improving or expanding a current operation, this course addresses how to set it up effectively using principles of Industrial Engineering and Facility Design. Primary topics begin with principles affecting material flow through a system, material management, work flow in a system, and work scheduling. Balancing these operations naturally produces greater shop capacity and productivity.

Following this course, participants will be able to:
• Understand the key principles of material and work flow
• Improve material management and stock levels
• More accurately schedule task activities for the shop workforce
• Identify obstacles and impacts to activities in the system
• Design an effective layout for the shop floor and work cells