We Are the National Electrical Contractors Association

The Voice of the Electrical Construction Industry. Learn More
Welcome back,

Event Archive

Change Order Guidelines for Electrical and Low Voltage Contractors Webinar

  • 01/29/2015

On January 29, NECA and ELECTRI International hosted a very successful webinar announcing and highlighting the new Change Order Guidelines report. For those of you who were not able to make the live event the recording can be found here. Both the full report and and the quick reference guide are available as FREE downloads in the NECA Store for NECA Members and ELECTRI contributors.

Download or Watch the Recording


ELECTRI International – The Foundation for Electrical Construction Inc. has released its newest study, Change Order Guidelines for Electrical and Low Voltage Contractors (F3405a). The research team included Construction Management faculty Matt Syal, Joseph Diffendal and Daniel Duah from the School of Planning, Design and Construction at Michigan State University.

Leaders of ELECTRI recognize that change orders authorizing modifications to the scope of the work, the contract sum and the contract time are an essential part of every construction project, and these orders are issued to accommodate changes to the construction contract.

A webinar will be held on Thursday, January 29 at 2 pm EST to discuss the findings of the report with the lead investigator, Matt Syal of Michigan State University.

There is no cost to attend, but registration is required for this event.

Attendees will utilize audio broadcasting services through their computer speakers. A toll free number will be provided for those unable to utilize this service.


Download or Purchase F3405a